“Norderney”
Scope of work:
- Cleaning and painting of the hull;
- Repair on leaking stern tube shaft;
- Making of hull thickness measurement report.
Comments off
Scope of work:
- Cleaning and painting of the hull;
- Repair on leaking stern tube shaft;
- Making of hull thickness measurement report.
Comments off
Scope of work:
- (Dis)assembly of steering gear and rudder;
- (Dis)assembly of propeller shaft to replace stern tube seals.;
- Making and mounting of new rope guard;
- High pressure water washing and painting of under water area;
- Replacing of zinc anodes.
Comments off
Scope of work:
- Class inspection;
- High pressure water washing and painting of hull;
- Repairs on towing pins, HPR sonar and wire guides;
- Repairs on four bow stern thrusters;
- Repairs on main engines and gear boxes;
- Repairs of all propeller blades;
- Making of new rudder protection beams;
- Renewal of furniture of several cabins;
- Renewal of several pipes.
Read the rest of this entry »
Comments off
Scope of work:
- High pressure washing and painting of hull;
- Periodic class inspection;
- Meggertest and replaced circuit breakers;
- Overhauled hatch crane;
- Renewed and replaced pipe work;
- Overhauled Cedervall stern tube seals
Comments off
Scope of work:
- High pressure washed, spot hydro blasted and painted the barge;
- Replaced anodes;
- Renewed steel of cooling water inlet chest;
- Installed new cooler.
Comments off
Scope of work:
- Installation of new 5t crane including constuction of new foundation;
- Installation of foam monitor on heli deck including pipework and tank;
- Construction and installation of winchplatform taut wire system;
- Construction and installation of Davit foundation for FRC;
- Periodic class survey;
- High pressure washing + painting of hull and topside;
- Overhaul of 4 main engines;
Read the rest of this entry »
Comments off
Scope of work:
- Dis-assembly/assembly of Propeller shaft due to seal renewal;
- Repairs to CPP blades;
- Periodic maintenance, class inspection and survey;
- High pressure washing / Painting of Bottom, immersed hull and sides;
- Maintenance/repairs to bottom doors.
Comments off
Scope of work:
- Various hull damages, replaced hull parts and frames.
- Vacuum tested hull after repears;
- Repairs on spud pole casings, spud poles removed and stored on yard;
- Overhauling of 4 spud poles, various lengths renewed;
- High pressure washing/sanding/painting of hull and submersed sides;
- Aluminium hatch repairs, dis assembly/straitening/welding/
rubber replacement/assembly.
Comments off
Scope of work:
- Periodic class survey;
- High pressure washing and painting of hull and topside;
- Hydro blasting and conservation of stone dumping slide doors / dumping decks;
- Disassembling and overhauling of “Voith Sneider” propulsion units, forward and aft;
- Azimuth alignment of Voith Sneiders, main- and auxiliary-engines;
- Replacement of cathodic protection system;
- Gangway damage, welding of aluminium;
- Steel thickness measurements of various stone dumping compartments;
Comments off
Scope of work:
- Periodic class survey;
- Dis assembly of propeller shaft due to C.P.P. maintenance;
- Polishing and crack tests of C.P.P. blades;
- Dis-assembly of rigging for maintenance;
- Various steelwork on deck;
- Grid blasting and repainting of bowthruster room;
- High pressure washing, hydro blasting and painting of under water area and topside;
Comments off