“VOS Sweet”
Scope of work:
- Fitting of new deck crane;
- Making of complete workshop on main deck;
- Refit of mess- and dayroom;
- Installation of HIPAP;
- Installation of secondairy mast;
- Installation of tautwire.
Comments off
Scope of work:
- Fitting of new deck crane;
- Making of complete workshop on main deck;
- Refit of mess- and dayroom;
- Installation of HIPAP;
- Installation of secondairy mast;
- Installation of tautwire.
Comments off
Scope of work:
- Removing, adapting and re-installing of foundation of accommodation containers;
- Re-installing of sliding doors.
Read the rest of this entry »
Comments off
Scope of work:
- Renewal of cargo hold plating;
- Several steel repairs on coaming, hull and cargo seal.
Read the rest of this entry »
Comments off
Scope of work:
- High pressure washing and painting of hull;
- Periodic class inspection;
- Meggertest and replaced circuit breakers;
- Overhauled hatch crane;
- Renewed and replaced pipe work;
- Overhauled Cedervall stern tube seals
Comments off
Scope of work:
- High pressure washed, spot hydro blasted and painted the barge;
- Replaced anodes;
- Renewed steel of cooling water inlet chest;
- Installed new cooler.
Comments off
Scope of work:
- Installation of new 5t crane including constuction of new foundation;
- Installation of foam monitor on heli deck including pipework and tank;
- Construction and installation of winchplatform taut wire system;
- Construction and installation of Davit foundation for FRC;
- Periodic class survey;
- High pressure washing + painting of hull and topside;
- Overhaul of 4 main engines;
Read the rest of this entry »
Comments off
Scope of work:
- Dis-assembly/assembly of Propeller shaft due to seal renewal;
- Repairs to CPP blades;
- Periodic maintenance, class inspection and survey;
- High pressure washing / Painting of Bottom, immersed hull and sides;
- Maintenance/repairs to bottom doors.
Comments off
Scope of work:
- Various hull damages, replaced hull parts and frames.
- Vacuum tested hull after repears;
- Repairs on spud pole casings, spud poles removed and stored on yard;
- Overhauling of 4 spud poles, various lengths renewed;
- High pressure washing/sanding/painting of hull and submersed sides;
- Aluminium hatch repairs, dis assembly/straitening/welding/
rubber replacement/assembly.
Comments off
Scope of work:
- Assistance to “Schottel” with solving leak on PS thruster;
- Touch up on hull paint and anti-fouling.
Comments off